Skip to main content

Website under maintenance - Sitio web en mantenimiento

Saint Kitts and Nevis


 General Information

Saint Kitts and Nevis faces persistent challenges in wastewater management. Most households rely on septic tanks, with limited regulation and no centralized sewerage system. Greywater is often discharged directly into the sea, while urban growth in Basseterre and Charlestown places further pressure on existing infrastructure. Outdated legislation and the absence of effluent standards have left gaps in regulating discharges and protecting sensitive watersheds and marine environments. 

Through GEF CReW+, the country advanced significant reforms and piloted nature-based solutions. At the policy level, the project reviewed the wastewater policy and legal framework and developed a Draft National Wastewater Policy, supported by the creation of National Wastewater Effluent Discharge Standards. These were complemented by a National Strategy and Action Plan on Wastewater Management, providing a roadmap for more coordinated action across institutions. A milestone was achieved with the ratification of the LBS Protocol on 10 October 2024, aligning Saint Kitts and Nevis with regional commitments under the Cartagena Convention. 

At the community level, CReW+ designed and constructed a constructed wetland pilot plant at College Street Ghaut in Basseterre, treating and reusing greywater through a low-cost, ecological system of subsurface flow wetlands. The pilot not only reduced pollution but also demonstrated practical options for reuse and community engagement. 

Together, these activities modernized the policy framework, introduced effluent controls, and showcased sustainable treatment solutions that can be replicated to strengthen integrated water and wastewater management across the islands. 


GEF CReW+ in Saint Kitts and Nevis

Component 1: Institutional Framework

  • Review of Wastewater Policy and Legal Framework
  • Draft National Wastewater Policy
  • National Wastewater Effluent Discharge Standards
  • National Strategy and Action Plan on Wastewater Management
  • Ratification of the LBS Protocol on the 10th of October 2024.


Component 3: Technical Solutions

  • Design and Construction of a Constructed Wetland Pilot Plant for Collection, Treatment and Reuse of Greywater in the College Street Ghaut, Basseterre 


Latinosan Conference, 2022

Financed by
GEF
Co-implemented by
IDB
UNEP
Co-executed by
CEP
GIZ
OAS

About Us

Implementing water and wastewater solutions for a clean and healthy Caribbean Sea.

©GEF CReW+. Some rights reserved.
Permission is granted to duplicate materials for non-commercial, non-profit use only, provided acknowledgment is given. All other rights are reserved.
Powered by